El Hammam & Bahig Blocks

El Hammam & Bahig Blocks

Civil & Signalling Support

Trench excavation works supporting railway signalling and infrastructure installation.

MCS Rail carried out trench excavation between El Hammam and Bahig blocks, approximately 30 cm wide, 1.5 metres deep, and around 2,500 metres long.

ProjectEl Hammam & Bahig Blocks
LocationNorth Coast, Egypt
SectorCivil & Signalling Support
Delivery focusSafety · Quality · Programme
Scope highlights

What we
delivered.

A controlled scope built around technical precision and dependable site execution.

0Approximate trench length
0Typical trench width
0Typical trench depth
Signalling support works
Project gallery

Execution
on site.

Selected images showing the delivered scope and site interface.

Discuss a similar railway scope.

Contact our team ↗
Message us