El Obour Station
Dismantling & Logistics
Removal, sorting, stacking, and transportation of railway track assets to designated storage locations.
Works extended from El Obour Station to kilometre 17 on the Suez line and included dismantling, material control, sorting, stacking, and transport in accordance with railway asset procedures.
ProjectEl Obour Station
LocationCairo-Suez Line, Egypt
SectorDismantling & Logistics
Delivery focusSafety · Quality · Programme
Scope highlights
What we
delivered.
A controlled scope built around technical precision and dependable site execution.
Track asset removal
Sorting and stacking
Material control
Transport to storage
Project gallery
Execution
on site.
Selected images showing the delivered scope and site interface.
